Solar PV Power Plant

Approximate Price, Size, Shadow Free Area Required and Time to implement a Solar PV Plant.
  • Residential
  • Rooftop Power Plant
  • Rs. 65~75/Watt
  • Solar Panel, Inverter, Structure, BOS, Design & Installation. Grid connected with no battery backup. (*restrictions apply)
  • 2.5 KW ~ 10 KW size
  • > 250~1000 Sq. Ft Roof
  • 2~4 Weeks Time
  • Call Us
  • Commercial
  • Rooftop or Ground
  • Rs. 55~65/Watt
  • Solar Panel, Inverter, Structure, BOS, Design & Installation. Grid connected with no battery backup. (* certain restrictions apply)
  • 10 KW ~ 250 KW Size
  • > 1000 ~ 25000 Sq. Ft. Shadow free Area
  • 1~3 Months Time
  • Let's Meet
  • Utility
  • Ground Mounted
  • Rs. 50~55/Watt
  • Solar Panel, Inverter, Structure, BOS, Design & Installation. Grid connected with no battery backup (* certain restrictions apply)
  • 250 KW ~ 5 MW Size
  • 1 Acre ~ 25 Acre Land
  • 3 ~ 18 Months Time
  • Let's Discuss
Enerzytech®
Powering the Energy Revolution

New York Times : Solar Energy

  1. On energy, Trump and company are trying to stop technological progress.
  2. American companies want a level playing field with their Chinese counterparts. China wants to build its industries into sophisticated global competitors. This week, both countries demonstrated a willingness to escalate trade tensions to defend their positions.
  3. The world added more solar power than any other energy source in 2017. But it's still a tiny fraction of total electricity.
  4. Gas was seen as a bridge from coal to an alternative-energy future. Regulatory moves to speed that transition have unsettled the utility industry.
  5. As Graham Hill, of TreeHugger and LifeEdited, discovered when he built a home in Hawaii, a green house can be more luxurious than a conventional one.
  6. Debbie Dooley, an early Tea Party organizer who backs President Trump, says embracing alternative energy is part of a consistent worldview.
  7. A project near a world heritage site in Kenya embodies a contradiction of Chinese climate leadership: Cutting coal use at home while promoting it abroad.
  8. Building renewable plants from scratch has become cheaper in some parts of the country than operating old coal-fired plants.
  9. Riyadh plans to build a $300 million solar farm that would generate enough electricity to power around 40,000 homes, an example Saudi leaders hope will have positive consequences.
  10. For a more robust power system, the region needs multicountry investments and a better regulatory framework.
To know more about how your home or business can benefit from our products & services, Get in touch with us Today !

About Us

EnerzyTech® Industries Pvt. Ltd. is an emerging player in India's conventional and non-conventional energy sector and caters to utility, residential, commercial and Government clients. Our emphasis is on renewable energy, solar in particular.

Subscribe Here

Subscribe to our newsletter and stay updated on the latest developments and special offers!

Contact Us

Enerzytech Industries Pvt. Ltd.
C 211, Titanium City Center,
100 Ft. Anand Nagar Road,
Prahlad Nagar, Ahmedabad - 380015
Ph : +91-(972) 713-9999
Skype: Enerzytech